Voltage optimisation typically delivers a 5-15% electricity saving for candidate UK commercial sites, with a 2-3 year payback. The savings then continue for the 10-15+ year asset life. The skill is knowing which sites qualify — and which don't.
The basic case
UK grid voltage is allowed to sit anywhere within a regulated range, and in practice most sites are supplied at the upper end. A voltage optimisation unit drops the voltage to a stable optimal level and prevents the waste. For candidate sites, this delivers a 5-15% reduction in electricity consumption.
When VO works well
- Older equipment rated for lower voltages.
- Motor-heavy loads — pumps, fans, conveyors, compressors.
- Significant lighting load on fluorescent or HID lamps.
- Continuous operation.
- Currently high incoming voltage (measured during the survey).
When VO doesn't work
Sites with mostly modern variable-speed-drive equipment, sites with predominantly LED lighting, specialist industrial processes requiring specific voltage, or sites with very low operating hours.
Modelling the ROI
A defensible VO business case has three components: baseline voltage measurement, savings model, and payback calculation.
Bottom line
VO is one of the highest-ROI interventions available for the right commercial site. It pays back in 2-3 years on candidate sites, then drops 5-15% off your electricity bill for the rest of the asset life.
Voltage optimisation ROI — when does VO pay back? — quick questions
More articles
A practical deep dive into Multipurchase contracts
Multipurchase contracts offer UK businesses with 1–5 GWh portfolios a structured approach to energy procurement, combining flexibility with cost control. This article explains how tranches, period choices, caps, and triggers work in practice, with a real-world example using current UK market conditions and TUS’s proven approach to optimisation.
Why stock market volatility can be a positive for gas and power buyers
When stock markets fall, investors expect slower economic growth — which often translates into softer energy commodity prices. Businesses on flex or multipurchase contracts can use these windows to lock in tranches at lower prices.
The E11 nuclear charge, explained — what UK businesses need to know
The E11 charge is a new non-commodity component on UK electricity bills from April 2025, funding new UK nuclear generation. It is small per kWh but adds up — and like other non-commodity components, you can choose to fix it into your unit rate or pass it through.
Ready to take control of your energy spend?
Talk to a TUS energy consultant about a free Energy Health Check — usually 15 minutes, with a written summary back to you.